Permission to build a house will be different By today, let’s get to know that each house is built. What permissions are required? in order not to waste time in construction anymore
Note : We are a house building company. We have been a well-known company in the home building business for a long time. We have more than 5000 houses built in Thailand. find more information on our website : https://www.trendyhome.co.th/
Build a knock-down house (main house)
Permission is required. There is a plan showing details. Engineer calculation list according to the law
Most of them are correct Asking for permission Needing a loan Bank Needing a construction permit Needing a registration house/house number Want to request a permanent type of electricity / water meter, do not want to have problems with district/municipal officer
compulsory necessity Applying for a bank loan requires a building permit. Construction permit, must have a list of engineer calculations, apply for house registration and house number that must have a building permit Applying for a permanent electric meter, water meter, must have house registration / house number
If it’s not convenient, the price is high, you may change your mind to build a cement house instead.
Build a cement house – CSO (Main House)
For building a house in this style, permission is required. There is a plan showing details. Engineer calculation list according to the law
Most of them are correct Asking for permission Needing a loan Bank Needing a construction permit Needing a registration house/house number Want to request a permanent type of electricity / water meter, do not want to have problems with district/municipal officer
compulsory necessity Applying for a bank loan requires a building permit. Construction permit, must have a list of engineer calculations, apply for house registration and house number that must have a building permit Applying for a permanent electric meter, water meter, must have house registration / house number
If it’s not convenient, complicated, and the price is high, then build a house because it meets your needs.
Build a knock-down house (secondary house)
Permission is required. There is a plan showing details. Engineer calculation list according to the law
Most (wrong) did not ask for permission. don’t want hassle no need to save the cost of the design and Engineer calculation list Build according to standard It costs more than what the contractor does.
no need Did not apply for a house registration/house number Did not ask for electricity/water meters, permanent type, used to connect electricity, water from the main house.
If it’s inconvenient, difficult, expensive, doesn’t answer the question, it won’t build or buy it.
Adding a house to a residential building
Permission is required. There is a plan showing details. Engineer calculation list according to the law
Most (wrong) did not ask for permission. don’t want hassle no need to save the cost of the design and Engineer calculation list Build according to standard It costs more than what the contractor does.
no need Did not apply for a house registration/house number Did not ask for electricity/water meters, permanent type, used to connect electricity, water from the main house.
Permission to build a knock-down house Construction of houses in the area is strictly in accordance with the following legal requirements:
- The narrowest room in the building is not less than 2.5 meters, the room size is not less than 8 square meters, and the vertical distance from the floor to the ceiling is not less than 2.6 meters.
- corridors in residential buildings with a width of not less than 1 meter
- A room in a building must have doors, windows or ventilation holes not less than 10% of that room area.
- Each residential building must have a bathroom, consisting of 1 toilet, 1 shower, 1 sink, and a vertical toilet. From floor to ceiling not less than 2 meters, bathroom size not less than 1.5 square meters, interior width not less than 0.9 meters, ventilation holes not less than 10% of the room area.
- The vertical distance of the balcony from floor to ceiling is not less than 2.2 meters.
- Stairs have a net width of not less than 80 cm., stepping distance not more than 20 cm., stair steps less overhang, not less than 22 cm. Stairs 3 meters high must have a landing at every step of 3 meters or less. must have a width and length of not less than the width of the stairs The vertical distance from the steps or landings to the lowest part of the building must not be less than 1.9 meters high
- Top windows and doors. Must be at least 1.8 meters high from the floor
- Space outside the building. Residential buildings must have a vacant area of not less than 30 in 100 parts of the area of one of the highest floors of the building.
- The kitchen in the building must have floors and walls made of fireproof permanent materials, whereas ceilings, if not made of permanent fireproof materials. It is to be lined with fireproof material.
- Buildings not taller than 9 meters with a distance of not less than 2 meters from the land area.
- Construction near public roads with a width of less than 6 m. from the center of a public road at least 3 meters
- Build a house near A water source with a width of less than 10 meters, the building line should be shortened, not less than 3 meters from the water source area (more than 10 meters wide, not less than 6 meters, ponds, lakes or the sea. to shorten not less than 12 meters)
- distance between buildings Buildings with a height not exceeding 9 meters, walls or balconies of buildings must be at least 4 meters from balconies and walls of other buildings.
- Build a fence not more than 3 meters high.
- Armor wells and seepage ponds must be at least 10 meters away from rivers, canals, or public water sources.
Caution…
In case of bringing a knock-down house to make a hotel, resort and homestay, it must be designed. by a person who knows the law of the hotel and build a house according to the law
In order not to have a problem with the permission of the hotel not being a pirate hotel, there will be endless expenses in other areas. until the hotel license is obtained.